What if nobody in Gisborne does this?
Then the honest answer is that it comes from out of the region, and the quote should say so with the travel in it. NovaPay asks locally first and widens rather than pretending the choice is bigger than it is.
What are the stopping levels?
New Zealand plasterboard finishing runs to levels, with the higher ones meaning more coats and more sanding for a flatter result. Level 4 is the common residential standard and level 5 is used where lighting is critical.
Is painting included?
Usually not, though many plasterers work alongside a painter. Ask, because a plastered wall is not finished until it is sealed and painted, and the handover between the two is where jobs stall.
Can old textured ceilings be smoothed?
Often yes, by skimming, though textured ceilings in older houses can contain asbestos and must be tested before anyone disturbs them. A plasterer should raise that before quoting.
How long before I can paint?
Compound needs to dry fully between coats and before painting, so allow days rather than hours, longer in winter. Rushing it shows through the paint.