How far will an Auckland business actually travel?
Most work a patch rather than the region. Plenty of North Shore businesses will not cross the bridge for a two-hour job, and nobody in Pukekohe is driving to Warkworth for one. NovaPay asks businesses near you first, and any travel or call-out fee is stated in the quote rather than found on the invoice.
Can I get someone the same week in Auckland?
Usually, for the smaller jobs. How urgent it is goes out with the request, so a business with nothing free that week can say so instead of leaving you waiting on a callback.
How long before I can drive on it?
Usually around seven days for foot traffic and closer to a month before a vehicle, though your concreter will give you the number for the mix and the weather. Driving on it early is the most common way a good driveway is ruined.
Why do quotes differ so much?
Almost always preparation and reinforcing rather than the concrete. Ask what depth, what mesh or reinforcing, and what base is going underneath, because those are what decide whether it cracks in five years.
Do I need a vehicle crossing permit?
If the work touches the footpath or kerb, yes, and it comes from the council. Many concreters handle it, so ask whether it is included or something you arrange.
Can concrete be poured in winter?
Yes, but it cures more slowly and very cold or wet conditions can affect the finish. A concreter working through winter will plan around the forecast rather than pour regardless.